Project overview

The section of Medowie Road heading south from Blueberry Road to the recently upgraded intersection at Catherine McAuley Catholic College has numerous pavement failures that have been repaired over the years.

With increased traffic in the area this section of road will be subject to further traffic loadings and pavement failures.

The works included:

  • Removal of the existing road wearing course and 300mm of existing pavement.
  • Insitu stabilisation of up to 200mm of existing subbase pavement material.
  • New subsoil drains in each shoulder.
  • New 300mm thick stabilised road base pavement material.
  • New asphalt wearing course.
  • New linemarking to match the existing linemarking layout.

Grant Whitbourne

Project Manager