Project overview

Janet Parade, Salt Ash, has several residents accessing their properties and an operational quarry at the end of the road. Due to the significant truck movements from the Redisand Quarry, Janet Parade has experienced accelerated deterioration. This deterioration has resulted in significant surface and pavement defects, and as a result, renewal/reconstruction treatment is required.

These works include the remediation, using an asphalt pavement and overlay in the work area on Janet Parade, as outlined in the map below.

Janet Parade Road Closures

Brad Schlenert

Project Manager